Data center floor with active server racks managed by Integrator Services
FACILITY INFRASTRUCTURE · EMEA & DUTCH CARIBBEAN

Data Centers Never Sleep. Neither Do We.

Built for data center managers, hyperscale tenants, and enterprise IT teams who need to scale capacity, run 24/7 maintenance, and commission new infrastructure — without risking live-load downtime.

OPERATING METRICS
99.999%
Target uptime
2 h
P1 resolution goal
24/7/365
Response window
5 / 6
Cx levels covered
WHAT WE DO

Three teams. One promise: your load stays live.

From the day your equipment arrives to the day you retire it, we keep it running. Documented SLAs, engineers vetted for live-load work, and a step-by-step commissioning process — no surprises.

TOOL · 2-MINUTE ESTIMATE

Planning a data center build or expansion?

Get an instant estimate for your deployment or resourcing scope — no email required to run the calculator.

Try the cost calculator
WHY NOW · AI & DATA

AI is doubling your capacity needs. Traditional deployment can't keep up.

New AI clusters, GPU pods, and inference workloads want capacity online yesterday. We match that pace — day shifts, night shifts, weekends, whatever your build calendar demands.

24 / 7

Deployment shifts — day, night, weekend.

365

Days a year. No frozen weeks.

Hybrid

Permanent core + flex bench, on your calendar.

AI-ready

High-density racks, liquid cooling, GPU pods.

DEPLOYMENT · EXPANSION · UPGRADES

More racks live, faster — without disrupting the ones already running.

Every project starts the same way: how do we bring more capacity online safely, on a working floor? We answer with rack-and-stack crews, floor expansions, upgrades, and migrations — planned around your SLA and delivered by engineers who've done it a hundred times.

See deployment capabilities
RACK & STACK

Cage build, PDU drops, structured cabling, server install, asset tagging.

FLOOR CAPACITY

Activating dark white-space — power, cooling and network extended into new halls.

UPGRADES

UPS refreshes, ATS swaps, chiller replacements, BMS modernization — concurrently maintainable.

MIGRATIONS

Workloads moved between halls or out of legacy kit with full chain-of-custody.

SLA · FACILITY INFRASTRUCTURE

Facility Infrastructure SLA

A documented response model that defines what happens before, during, and after an incident.

● P1
P1 · Critical
GOAL
2-hour resolution
STATUS
Total failure
IMPACT
Load is down, site overheating, or life-safety at risk.
● P2
P2 · Urgent
GOAL
4-hour resolution
STATUS
Redundancy lost
IMPACT
System running but unprotected. Next failure escalates to P1.
● P3
P3 · Standard
GOAL
Next business day
STATUS
Stable
IMPACT
Fully functional; minor or preventive work scope.
SECURITY · NDA-FIRST

Your data center secrets stay in your data center.

Every engagement starts with a signed NDA — before we see a single drawing. Vetted, named engineers. GDPR-aligned data handling. And we never publish your name, logo, or site photos without written consent.

Planning a build, a migration, or need a 24/7 service partner?

Tell us what you're planning. You'll get a scoped proposal back in plain English — no consultant-speak, no black-box pricing.

Start the conversation
PRIVACY

We keep this site simple.

We use one first-party cookie to remember your language choice and light analytics (pageviews only, no cross-site tracking) to improve the site. No third-party ad networks, ever.

Read the full privacy note →