DEPLOYMENTS · EXPANSION

Deploy racks, expand floors, upgrade infrastructure — at pace.

From the first cage delivery to the last patch cord labelled, we run server-rack deployment campaigns and server-floor expansions across EMEA — without disrupting the loads already running next door.

200+
Racks delivered per quarter
MW-scale
Floor capacity activated
Zero
P1 incidents on live floor during build
≤ 2 wks
From scope sign-off to mobilization
WHY NOW · AI & DATA DEMAND

Data and AI are scaling faster than floors can keep up.

Every quarter, new AI training clusters, GPU pods and inference workloads push operators to bring capacity online faster than traditional deployment cycles allow. Rack counts, power density and cooling demand are growing at the same time — and the build window keeps shrinking.

24 / 7 DEPLOYMENT

Our crews work around the clock — day shifts, night shifts, weekends, public holidays. The build clock never stops.

365 DAYS A YEAR

No frozen weeks, no December slowdown. If your floor needs racks online before quarter-end, we mobilize on a calendar that matches yours.

HYBRID TEAMS

Permanent core + flex bench. Teams blended around customer needs — willing to work each day of the week, any time of day, with rotation that keeps quality and safety high.

PACE FOR AI

Optimized for high-density rack deployment, liquid-cooling retrofits and GPU-pod build-outs — the workloads driving the next 5 years of floor demand.

CAPABILITIES

What we deploy

RACKS

Server rack deployment

Full Rack & Stack sprints — from cage build, PDU drop and structured cabling, through server install, asset tagging and label verification.

  • Cage build & containment
  • Rack levelling, anchoring, bonding
  • PDU install, breakered & metered
  • Structured cabling (Cat6A / OM4 / OS2)
  • Server install, labelling & asset tagging
FLOOR

Server-floor capacity expansion

Bringing dark white-space online: power, cooling and network capacity extended into new halls or unused tiles without touching live loads.

  • White-space activation & tile reconfiguration
  • Busway extensions, PDU additions, new circuits
  • Cold-aisle containment retrofit
  • Cooling capacity rebalancing (CRAC / CRAH)
  • Hot-cut commissioning into the live floor
UPGRADE

Infrastructure upgrades

Brownfield power, cooling and BMS upgrades planned around the SLA — concurrently maintainable, with documented switching and rollback procedures.

  • UPS / battery string refresh & swaps
  • Generator overhauls and ATS upgrades
  • Chiller swaps, pump & valve replacements
  • BMS / EPMS modernization
  • Firmware & control-system updates
MIGRATE

Migrations & decommissioning

Moving workloads between halls, sites, or out of legacy infrastructure — with chain-of-custody, secure data-wiping and certified disposal.

  • Inventory baseline & migration runbooks
  • Physical relocation crews, packaging & transport
  • Secure erase / drive shredding to NIST 800-88
  • WEEE-compliant disposal & buy-back
  • As-built handover documentation
PROCESS

How a deployment moves through our floor

STEP 01

Scope & site survey

Power, cooling, network and access constraints documented. SLA windows agreed. Method statement and RAMS drafted.

STEP 02

Mobilization

Crew sized to scope — rack techs, electricians, cable runners, Cx engineers. Tooling, PPE and consumables on site.

STEP 03

Build & integrate

Racks built, power drops energised, structured cabling run and tested, servers installed. Daily progress logs.

STEP 04

Test & commission

Load-bank tests, failure-mode rehearsals, BMS points verified. Punch list closed with the site team.

STEP 05

Handover & close-out

Red-lined drawings, asset register, photos, test certificates, training. Site formally accepts.